Jump to the main content block
Division of Construction & Maintenance
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

9/19 The side door moving tree project of the food court

Description:
1. This project is scheduled for September 19, 2020 (Saturday) from 9:00 to 11:00 in the morning. Other unavoidable factors must be postponed and will be announced separately
2. The construction scope is the position of the side door of the snack bar, as detailed in the attached drawings and on-site announcements.
3. During the construction period, noise, dust and traffic flow will be affected, and the inconvenience caused, please bear with me.

Contractor: Shujing Gardening Huang Zhihong 0933417958
Contact: Xie Zhongsheng, Division of Construction and Maintenance 03-5715131 #35253
Emergency Contact for Campus Safety: Campus Security Office 03-5714769 (Campus phone:33333)
Click Num: