Construction period: July. 15 , 2024〜October. 15, 2024.
Details:
1. The toilet improvement project is scheduled to take place during 2024/07/15〜2024/10/15. The construction will be located in the area of 2nd and 3rd floors (Electrical Engineering Department), and the 5th and 7th floors (Electrical Engineering Department) at the Electrical Engineering and Computer Science Building.
2. Construction location: NTHU Electrical Engineering and Computer Science Building, as shown in the attached map below. We apologize for the noise and inconvenience caused by the machinery operations.
3. During the construction period, non-related personnel or vehicles should avoid the surrounding construction area, and kindly follow traffic control measures. We apologize for the inconvenience caused, as part of the roadway will be occupied at the time being.
In any case of major campus events or force majeure during the construction period, the project will be rescheduled accordingly.
Construction manufacturer: Jichen Construction Co., Ltd Mr. Wu: 0928-205343
Construction Supervisor: Chengbang Engineering Consultants Limited Mr.Lin: 0922-134676
Contact: Office of General Affairs, Division of Construction & Maintenance Mr. Lee: 03-5715131 ext. 31340、Ms. Yuan: 03-5715131 ext. 42898
Campus Safety:Emergency Contact: Campus Security Office 03-5714769 (Campus phone33333)

