12/16 Drilling Operation of National Tsing Hua University.
Details:
█ Drilling works will start from 2021/12/16(Thursday)
█ Construction might be postponed due to the weather or other unexpected situations.
█ Construction areas are shown on the maps below. Please do not enter without permission, to avoid danger.
█ To avoid damages to your vehicles, please do not park around the construction area.
█ We apologize for noises, dust, vibration, caused by the construction. Thank you for your cooperation.
Contractor:川島地質工程股份有限公司 03-5207618
Construction Supervisor:黃俊憲建築師事務所 03-5166133#26陳小姐
Contact:WU ZHEN-XIANG 03-5715131#62283, Office of General Affairs, Division of Construction and Maintenance
Emergency Contact for Campus Safety:Campus Security Office 03-5714769 (Campus phone:33333)
█ Drilling works will start from 2021/12/16(Thursday)
█ Construction might be postponed due to the weather or other unexpected situations.
█ Construction areas are shown on the maps below. Please do not enter without permission, to avoid danger.
█ To avoid damages to your vehicles, please do not park around the construction area.
█ We apologize for noises, dust, vibration, caused by the construction. Thank you for your cooperation.
Contractor:川島地質工程股份有限公司 03-5207618
Construction Supervisor:黃俊憲建築師事務所 03-5166133#26陳小姐
Contact:WU ZHEN-XIANG 03-5715131#62283, Office of General Affairs, Division of Construction and Maintenance
Emergency Contact for Campus Safety:Campus Security Office 03-5714769 (Campus phone:33333)
