5/10 AM2:00~8:00 First High Voltage Station Power Outage Notice
Power outage time: 05/10 (Sat) 02:00~8:00 in the morning
Power outage area: refer to the table below
Cause of power outage:
- In order to reduce the impact of the power outage on everyone, the power outage operation is scheduled to be handled from 2 a.m. to 8 a.m. on May 10 (the existing cables will be removed and the new cables will be installed), which will affect the power supply building of the first high-voltage station during the power outage.
- During the power outage, the relevant units of the faculties and dormitories in the power outage area must unplug all computers and experimental equipment in the jurisdiction, and cut off the power supply of the switchboard and switch box to maintain the safety of electricity and avoid the impact on the equipment when the power is restored.
- In addition to the relevant units of the dormitory in the power outage area, please respond in advance and notify you by email, please post an announcement at the entrance and exit of each building and the door of each floor of the elevator.
Cable replacement time: Estimated within 6 hours
Relevant departments and offices should prepare in advance.
Sincerely, Division of Construction & Maintenance
Staff of Electricity, Mr. Wu #62289