9/27 8:00-12:00Power Outage Announcement of Nanda Campus-Continuing Education Building

Power outage time: 9/27 (Saturday) 08:00~12:00

Power outage areas: ground floor of Continuing Education Building

Reason for power outage and things to keep in mind as follow:

1. We will be replacing cables between the P1B to P1C of distribution board at ground floor of Continuing Education Building in Nanda Campus. To minimize the impact of the power outage, a power outage will be scheduled from 08:00 to 12:00 on September 27.

2. All departments in the power outage area must unplug all computers and experimental equipment, and cut off the power supply at distribution boards and switch boxes during the specified time, to maintain electricity safety and avoid possible damage when power is restored.

3. In addition to requesting the correspondent units within the power outage area responded in advance, announcements will also be posted at the entrance and elevators each floor, apart from notifying via email. If any relevant matters are completed ahead of schedule, the electricity will be restored earlier. We apologized for any inconvenience this might cause to your unit.

Repair time: It is expected to be repaired within 4 hours (but it still depends on the on-site situation).

Please make preparations in advance

Sincerely,

Division of Construction and Maintenance

Contact number Hsu Sheng Wu Ext. 62286