6/16~7/24 General Building II 104 space preparation project
Construction period: 2026 Jun.16~ July.24
Description:
1. The project is scheduled from 2026 Jun.16~ July.24 General Building II 220 space preparation project.
2. The construction scope is shown in the attached picture. Please bear with the noise and inconvenience caused by the operation of the equipment during the period.
3. During the construction period, non-related personnel or vehicles should not approach the surrounding areas of the construction. People and vehicles should pass according to the control. During the operation, part of the lane must be occupied to cause inconvenience.
Construction company: Tectona Design Co., Ltd. Tel 0976-256-319
Contact: Office of General Affairs, Division of Construction & Maintenance Mr. Cheng: 03-5715131 ext. 35252
Emergency Contact for Campus Safety:Campus Security Office 03-5714769 (Campus phone:33333)
